Home
AboutContact

Based in

Great Yarmouth, Norfolk

Serving a 50-mile radius

A newly levelled subfloor, smoothed and left clean, ready for a fitted finish.

A Level Base Before a Single Plank Goes Down

Subfloor preparation, levelling and moisture checks before LVT, vinyl, carpet or safety flooring is fitted.

Request a Quote

Fill in your details and a fitter will come back to arrange the visit.

Loading secure quote form…
By submitting, you agree to our Privacy Policy and Terms.

Moisture

Checked first

Level

Before the finish

Priced

As its own line

Why Choose Our Floor Preparation?

A new floor is only as good as the base it sits on. Loose boards, a dusty screed or a dip in the middle of a room will telegraph through LVT and thin vinyl, and they will work a carpet loose at the edges.

Preparation can mean taking up the old covering, checking moisture, fixing boards, laying a smoothing compound or bringing a room to a true level. The survey names the work before the finish is even chosen.

Self-Levelling Compound

Fast-cure, feather-edge compounds for a perfectly level surface.

Boards Made Sound

Loose boards fixed, or overlaid where the survey says so.

DPM Moisture Barrier

Damp-proof membrane stops rising moisture from damaging your floor.

Latex Screeding

Thin-bed screeds for final-stage levelling precision.

Professional Assessment

Every subfloor is diagnosed before any work begins.

Priced on Its Own

The quote sets out preparation as its own line, separate from the finish.

Cured latex screed giving a flat, matte subfloor in an empty room, ready for floorcovering

Why does a subfloor need to be prepared?

Because LVT and vinyl show every dip, and a damp or dusty base will not hold adhesive. Preparation is what makes the finished floor stay tight and quiet.

Do you always use a smoothing compound?

No. Some boarded floors need a different approach, and some screeds only need a local repair. The survey decides, rather than putting compound on every job by default.

Can you work over old tiles or a painted floor?

Sometimes, if they are sound, dry and well stuck. Many painted or tiled floors still need to be lifted or overlaid, which is tested on site.

Is preparation priced on its own?

The quote sets out preparation as its own line so you can see the base work as well as the finish. A photo is not enough to price that line accurately.

Our Process

Every job follows the same careful sequence no shortcuts.

01

Assessment

We test for moisture, movement, and level deviation.

02

Strip Out

Existing flooring and adhesive removed and disposed of.

03

Plyboarding

Structural ply screwed and glued where needed.

04

Compound & DPM

Self-levelling compound and damp-proof membrane applied.

05

Quality Check

Level checked with a straight-edge before installation.

Our Work

Photographs of finished rooms. A town is not named on a picture until a labelled job is on file.

Rustic dark oak herringbone LVT meeting a freshly laid latex smoothing compound, part-way through a floor preparation job
Freshly poured latex smoothing compound curing to a mirror finish across a hallway floor
Cured latex screed giving a flat, matte subfloor in an empty room, ready for floorcovering
Wet latex smoothing compound poured across a room, reflecting the French doors at the far end
Close view of wet latex screed levelling itself out across a subfloor before floorcovering is laid

Ready for Your New Floor?

Book a subfloor survey through the form, or call 07984 678360 before you choose a finish.