
A Level Base Before a Single Plank Goes Down
Subfloor preparation, levelling and moisture checks before LVT, vinyl, carpet or safety flooring is fitted.
Request a Quote
Fill in your details and a fitter will come back to arrange the visit.
Moisture
Checked first
Level
Before the finish
Priced
As its own line
Why Choose Our Floor Preparation?
A new floor is only as good as the base it sits on. Loose boards, a dusty screed or a dip in the middle of a room will telegraph through LVT and thin vinyl, and they will work a carpet loose at the edges.
Preparation can mean taking up the old covering, checking moisture, fixing boards, laying a smoothing compound or bringing a room to a true level. The survey names the work before the finish is even chosen.
Self-Levelling Compound
Fast-cure, feather-edge compounds for a perfectly level surface.
Boards Made Sound
Loose boards fixed, or overlaid where the survey says so.
DPM Moisture Barrier
Damp-proof membrane stops rising moisture from damaging your floor.
Latex Screeding
Thin-bed screeds for final-stage levelling precision.
Professional Assessment
Every subfloor is diagnosed before any work begins.
Priced on Its Own
The quote sets out preparation as its own line, separate from the finish.

Why does a subfloor need to be prepared?
Because LVT and vinyl show every dip, and a damp or dusty base will not hold adhesive. Preparation is what makes the finished floor stay tight and quiet.
Do you always use a smoothing compound?
No. Some boarded floors need a different approach, and some screeds only need a local repair. The survey decides, rather than putting compound on every job by default.
Can you work over old tiles or a painted floor?
Sometimes, if they are sound, dry and well stuck. Many painted or tiled floors still need to be lifted or overlaid, which is tested on site.
Is preparation priced on its own?
The quote sets out preparation as its own line so you can see the base work as well as the finish. A photo is not enough to price that line accurately.
Our Process
Every job follows the same careful sequence no shortcuts.
Our Work
Photographs of finished rooms. A town is not named on a picture until a labelled job is on file.





Ready for Your New Floor?
Book a subfloor survey through the form, or call 07984 678360 before you choose a finish.