Home
AreasGalleryFAQAboutContact

Based in

Great Yarmouth, Norfolk

Serving a 50-mile radius

Wet latex smoothing compound poured across a room, reflecting the French doors at the far end
We Never Skip the Prep

Floor Preparation in Great Yarmouth & Norfolk

Proper floor preparation is the foundation of every lasting floor. Plyboarding, levelling compounds, DPM barriers done right, every time.

See Our Work

50%

Of Every LVT Job

Zero

Shortcuts Taken

Lifetime

Substrate Guarantee

About this service

Why Choose Our Floor Preparation?

Floor preparation accounts for around 50% of the work on every LVT or vinyl job. It's also the step most often skipped by inexperienced fitters and the number-one reason floors fail. We take floor prep seriously: every substrate is assessed, every imperfection addressed, before a single tile is laid.

Self-Levelling Compound

Fast-cure, feather-edge compounds for a perfectly level surface.

Plyboarding

Structural ply bridges uneven boards and adds stiffness.

DPM Moisture Barrier

Damp-proof membrane stops rising moisture from damaging your floor.

Latex Screeding

Thin-bed screeds for final-stage levelling precision.

Professional Assessment

Every subfloor is diagnosed before any work begins.

Long-Lasting Results

Correct prep means your floor lasts decades, not years.

Cured latex screed giving a flat, matte subfloor in an empty room, ready for floorcovering

Step by step

Our Process

Every job follows the same careful sequence no shortcuts.

01

Assessment

We test for moisture, movement, and level deviation.

02

Strip Out

Existing flooring and adhesive removed and disposed of.

03

Plyboarding

Structural ply screwed and glued where needed.

04

Compound & DPM

Self-levelling compound and damp-proof membrane applied.

05

Quality Check

Level checked with a straight-edge before installation.

Real projects

Our Work

Photos from installations completed across Norfolk.

Rustic dark oak herringbone LVT meeting a freshly laid latex smoothing compound, part-way through a floor preparation job
Freshly poured latex smoothing compound curing to a mirror finish across a hallway floor
Cured latex screed giving a flat, matte subfloor in an empty room, ready for floorcovering
Wet latex smoothing compound poured across a room, reflecting the French doors at the far end
Close view of wet latex screed levelling itself out across a subfloor before floorcovering is laid

Common questions

Frequently Asked Questions

Any imperfection in the subfloor bumps, dips, moisture, or movement will telegraph through your new flooring over time. Poor prep causes tiles to lift, adhesive to fail, and floors to crack or creak. Getting the prep right the first time prevents expensive remedial work later.

Plyboarding involves screwing and gluing sheets of 6mm or 9mm structural plywood over an existing timber floor. It bridges gaps between floorboards, adds rigidity, and provides a flat, stable surface for LVT or vinyl sheet. It's required on virtually all timber subfloors.

A DPM (Damp-Proof Membrane) is a liquid or sheet barrier applied to concrete subfloors to prevent rising moisture from reaching your flooring. Moisture is the leading cause of adhesive failure in vinyl and LVT. We test for moisture before every installation.

We don't offer floor preparation as optional it's part of every LVT and vinyl installation we carry out. Skipping prep would compromise the finish and the longevity of the floor, and we're not willing to put our name to that.

Preparation for a typical room (20–30 m²) takes a few hours to one day depending on the condition of the substrate and the products used. Self-levelling compound requires a curing period before flooring can be laid on top.

Let's get started

Ready for Your New Floor?

Free home samples, no-obligation quote. Based in Great Yarmouth serving Norfolk and surrounding areas.

Call Us Today

Request a Free Quote

Fill in your details and we'll be in touch to arrange a free home visit.

Loading secure quote form…
By submitting, you agree to our Privacy Policy and Terms. We respond within 24 hours.